Sesame Batch-Press Workshop
Include loading, pressing, unloading and cleaning when measuring a batch workshop schedule. Decide the product and preparation route before choosing whether to add a heating stage.

Include loading, pressing, unloading and cleaning when measuring a batch workshop schedule. Decide the product and preparation route before choosing whether to add a heating stage.
Example process sequence
- Seed inspection and cleaning
- Preparation selected for the product
- Batch loading
- Hydraulic pressing and unloading
- Oil clarification and receiving
Define the equipment boundary
Separate the main machines from conveyors, receiving vessels, pumps, electrical controls and cleaning provisions. Mark what is already available at the site and what each quotation includes. The sequence is a discussion framework rather than a final engineering design.
Selection checklist
- Sesame source and product objective
- Batch cycle and operator tasks
- Prepared-material movement
- Oil collection and cleaning
Layout and working schedule
Prepare a simple site plan showing receiving, processing, product collection and movement of operators. Reserve access to routine service points. Use the same planned working hours when checking the handoff between stages, and identify the stage most likely to limit the complete process.
Compare a startup and an expansion scope
For a startup scope, list only the operations needed for the intended product. For an expansion, explain which bottleneck or new product requirement the added equipment should address. Keep future connections and utilities in the discussion without assuming that every workshop needs refining and bottling immediately.
View the main equipment · Watch supplier-reference demonstrations · Request a configuration discussion
Research reference: Sanyou equipment and workshop references. External equipment imagery illustrates a design, not confirmed YUNMAO supply or a YUNMAO installation.
